Maintenance Complete: 2018-07-09
- Cut and trimmed all turf areas.
- Algaecide application in creeks and spot application in pond.
- Litter pick of site and emptied garbage cans.
- Checked dog stand bags.
- Pulled debris out of pond and creeks.
- Pruned and shaped shrubs.
- Sprayed weeds in beds.
- Weeded beds in stream off Donsdale Drive.
- Repaired stuck float on Dalhousie entrance fountain sump pump.
- City of Edmonton removed several dead trees in stream and pond area.
Expected to complete July 16th- July 21st:
- Continue pruning deadwood and shaping shrubs.
- Weed beds throughout pond and creeks.
- Spray weeds in beds as needed.
- Apply Muck Pellets and All Natural Clarifier in creeks and pond.