Maintenance Complete: 2018-06-25
- Cut and trimmed all turf areas.
- Litter pick of site and emptied garbage cans.
- Checked dog stand bags.
- Pulled debris out of pond and creeks.
- Pruned deadwood out of shrubs.
- Pruned branches that were sticking into the walking path.
- Cut down thick cat tail areas in creeks.
- Replace rocks on liner that had been thrown into stream.
- Replaced failed components in control panel for stream fountain pump.
Expected to complete July 3rd- July 7th:
- Continue pruning dead wood out of shrubs.
- Apply muck pellets and all natural clarifier in pond and creeks.
- Check medians for weeds and dead wood.