Maintenance Completed the Weeks Of: 2020-06-29 and 2020-07-06

  • Dog bag/Garbage refills and removals
  • Trimmed all possible turf areas (Heavy rain left some areas untouchable)
  • Raked debris and algae from pond and streams
  • Cleared plant growth and thistles from around the first stream weir to the east of gazebo
  • Cut down excessive plant growth in streams
  • Applied algaecide to streams
  • Trimmed and weeded Dalhousie and Danbury entrances
  • Installed “Don’t Move/Throw the Rocks” signs where streams enter the pond
  • Followed up with the City on required pathway repairs and the planting of replacement shrubs

Expected to complete July 13th to 19th:

  • Repair leak in line to Dalhousie fountain nozzle.  Fountain will remain shutdown approx 3 weeks until cement cures.
  • Mow and trim all turf areas
  • Rake debris and algae from pond and streams
  • Apply algaecide treatment to pond
  • Apply water clarifier and muck pellets
  • Continue weeding shrub beds and pruning out dead wood
  • Trim, weed, prune Danbury and Dalhousie entrances if needed