Maintenance Completed the Week Of: 2019-05-20
Cut and trimmed all turf areas.
Raked debris and algae from pond and streams.
Topped up bark mulch in beds.
Hauled away pallets used during stream piping repairs.
Pulled floating fountain to check connections. No connection issues found, but fountain still trips GFI. Waiting for Otterbine factory service tech.
Installed new block valve and started the Danbury Fountain.
Repaired leaking pipe elbow below Dalhousie Fountain pool. Will start fountain once the cement has cured enough to apply epoxy sealer. Likely in 2 to 3 weeks.
Followed up with City of Edmonton regarding 3 pathway issues. All are still on their list to do.
Expected to complete May 27th – June 1st 2019:
Flocculent or algaecide treatment of stream and pond.
Weed, prune, clean up and trim Danbury and Dalhousie entrances.
Remove graffiti from the pillar at Lessard end of stream and pressure wash gazebo.
Build up soil around stream liners to better support liners.