Maintenance Complete: 2018-07-16

  • Cut and trimmed all turf areas.
  • Muck Pellet and All Natural Clarifier application in pond.
  • Litter pick of site and emptied garbage.
  • Checked dog stand bags.
  • Raked algae out of pond and creeks.
  • Pruned shrubs and weeded beds off Lessard Road.
  • Sprayed weeds in beds.
  • Reset stream pump overload which tripped during electrical storm.
  • Dalhousie fountain sump pump failed.  Rising groundwater shorted out fountain pump motor.

Expected to complete July 23rd- July 28th:

  • Replace Dalhousie fountain sump pump and fountain pump motor.
  • Spot spray algae if needed.
  • Continue weeding beds throughout pond and creeks.
  • Spray weeds in beds as needed.