Maintenance Completed the Week Of: 2019-08-12

  • Mowed and trimmed all grass areas.
  • Raked debris and algae from pond and streams.
  • Weeded mulch beds along south stream path.
  • Pruned deadwood from shrubs along north stream path.
  • Pulled vine weeds from shrub bushes on the east side of the north stream path.
  • Pruned shrub beside the path to Drysdale Run.

Expected to complete August 19th – 25th:

  • Mow and trim all grass areas.
  • Rake algae from pond and streams.
  • Trim and weed Danbury entrance.
  • Weed mulch beds along the north stream path and prune deadwood from shrubs along south stream path.
  • Excavate and repair faulted power cable for small fountain at Lessard end of stream.