Maintenance Completed the Weeks Of: 2020-06-29 and 2020-07-06
- Dog bag/Garbage refills and removals
- Trimmed all possible turf areas (Heavy rain left some areas untouchable)
- Raked debris and algae from pond and streams
- Cleared plant growth and thistles from around the first stream weir to the east of gazebo
- Cut down excessive plant growth in streams
- Applied algaecide to streams
- Trimmed and weeded Dalhousie and Danbury entrances
- Installed “Don’t Move/Throw the Rocks” signs where streams enter the pond
- Followed up with the City on required pathway repairs and the planting of replacement shrubs
Expected to complete July 13th to 19th:
- Repair leak in line to Dalhousie fountain nozzle. Fountain will remain shutdown approx 3 weeks until cement cures.
- Mow and trim all turf areas
- Rake debris and algae from pond and streams
- Apply algaecide treatment to pond
- Apply water clarifier and muck pellets
- Continue weeding shrub beds and pruning out dead wood
- Trim, weed, prune Danbury and Dalhousie entrances if needed