Maintenance Completed the Week Of: 2019-08-12
- Mowed and trimmed all grass areas.
- Raked debris and algae from pond and streams.
- Weeded mulch beds along south stream path.
- Pruned deadwood from shrubs along north stream path.
- Pulled vine weeds from shrub bushes on the east side of the north stream path.
- Pruned shrub beside the path to Drysdale Run.
Expected to complete August 19th – 25th:
- Mow and trim all grass areas.
- Rake algae from pond and streams.
- Trim and weed Danbury entrance.
- Weed mulch beds along the north stream path and prune deadwood from shrubs along south stream path.
- Excavate and repair faulted power cable for small fountain at Lessard end of stream.