Maintenance Complete: 2018-06-25

  • Cut and trimmed all turf areas.
  • Litter pick of site and emptied garbage cans.
  • Checked dog stand bags.
  • Pulled debris out of pond and creeks.
  • Pruned deadwood out of shrubs.
  • Pruned branches that were sticking into the walking path.
  • Cut down thick cat tail areas in creeks.
  • Replace rocks on liner that had been thrown into stream.
  • Replaced failed components in control panel for stream fountain pump.

Expected to complete July 3rd- July 7th:

  • Continue pruning dead wood out of shrubs.
  • Apply muck pellets and all natural clarifier in pond and creeks.
  • Check medians for weeds and dead wood.